I know I've already said it, but this week has cemented my belief that the DIY impulse is born out of frustration with contractors. We hired the drywall guy on Monday and he began the two-day job on Tuesday. Today he finished up, leaving us to do the final sanding. The quality of the work is far from perfect and he made a huge mess of the brand new tile, but I verified that it'll all clean off and paid him, just so I wouldn't be stuck waiting around for him to finish the work.

The hall bathroom - only shower for the four of us living here - now has walls, and those walls are primered. Tomorrow we paint, and then hopefully I can get the plumber to come install the toilet and sink Monday.

In addition to painting, tomorrow's work schedule includes demoing the 6'x7' area off the kitchen that's been designated the laundry-room-to-be and patching the wall outside the hall bathroom which is still covered in OSB and plastic with legitimate looking siding material.

There's a problem, though, in getting so close with the bathroom. It's a distraction. I need to be thinking about self-leveling concrete and instead I'm thinking about crown moulding. It's hard to move on to the next task because the bathroom is finally at a stage where I can envision how it'll look finished. I want to lay slate tiles down on the seat of the window and trim the door, as much to cover up the places where the paint and drywall are flawed as to indulge any kind of Martha Stewart impulse.

Fortunately, I can't get too dangerously off track because two big tasks are now underway: the roof and the HVAC. I meet with the bank next week to confirm that I have financing for both of these, which should be the last mind-boggling expenses that'll be necessary for a while. They'll also allow us to survive the winter. Even though I'm paying both of these contractors sums in the quintuple-digits, both jobs involve a significant amount of work on my end, both in coordination and in several things that need to go on in the attic.

The attic currently has loose insulation, with a modest R-7 rating. To qualify for the HVAC loan, I have to bring it up to R-38. I could just pile insulation on top of what's there, but there are some ceilings we don't want to drywall, and so it would be preferable to have something in the attic that won't create so much dust. Therefore, the very ambitious plan is to scoop out all the existing insulation while the roof's off. 1,400 square feet or so. I'm trying to look at it as an opportunity to get to know the one part of the house I haven't personally entered yet (I'm scared of heights and especially of ladders), but I think the more realistic view is that it's an opportunity to get insulation all over my yard while simultaneously not actually getting the attic clean.

It's daunting, especially because financing the very crucial heating system depends on it and because this all probably has to happen by the beginning of December. I have the beginning of next week off, though and, although I cringe at the thought of hiring anyone else, I know where the day laborers hang out.